Operation and maintenance of Bandar Abbas WWTP

 Operation, maintenance and repair of wastewater treatment plant of  Bandar Abbas  
operation, maintenance and repair of sludge section and mechanical dewatering unit of sludge
(Filter Blot Press) Sewage Treatment Plant in Bandar Abbas and West Pumping Station
* Purification system as active sludge - Complete mixing - With 205 liters of sewage per capita
* The total area of the treatment plant (facilities) is 8 hectares and (total) 30 hectares
* Covered population with 320,000 people
Average capacity: 117504 cubic meters per day
* Input average of 4896 cubic meters per hour and intake flow up to 6696 cubic meters per hour "