Operation & Maintenance of Bandar Abbas WWTP
Project management, operation, maintenance and repair of all facilities,equipment and general services of water treatment plant of BandarAbbas
The nominal capacity of this refinery is 1 m3 / s which is practically used up to a capacity of 0.9 m3 per second
* The second phase of the treatment plant with a nominal capacity of 2 cubic meters per second and, in special circumstances, is up to
2.4cubic meters per second
* Located 7 km away from Bandar Abbas-Minab road east of Bandar Abbas
Ownership of land with an area of about 11.5 hectares and a size of 250 * 460 meters